$16,100–$24,680
full roof replacement, typical 2,000 sq ft roof
Installed by our own crew, with free in-home measurement and a written price.
$16,100–$24,680
full roof replacement, typical 2,000 sq ft roof
$17,000
median written estimate, 2025–2026
$13,500middle half of jobs$22,000
Typical measured roof: 21 squares
From our measured estimates, 2025–2026 — signed and unsigned. Every job is priced line by line, so yours will differ. These are the typical quantities.
How we estimate a roofA roof replacement on a Somerville triple-decker or a side-hall colonial demands more from the materials and the crew than a suburban job does. Here is what the work involves on the houses we see across the city, how the permit and inspection process works, and what to check in a roofing quote before you sign.
Most Somerville houses we see are wood-framed colonials, two- and three-family homes, and capes built between the late 1800s and the mid-1900s. A full roof replacement starts with tearing off the old shingles down to the wood deck so we can check for rotted or delaminated sheathing. On older Somerville homes we often find a second layer of shingles underneath, and town code requires a full tear-off when two layers are already present.
GAF and CertainTeed asphalt shingle systems are our standard roofing products. The layers under the shingles matter as much as the shingles themselves. An ice and water barrier along the eaves and valleys seals around nail penetrations when melting snow backs up. That is where ice dams start on older Somerville roofs. Synthetic underlayment covers the rest of the deck and stays intact in wet weather.
Ridge venting lets warm air escape at the top of the roof. Snow melts more evenly, and the freeze-thaw cycle does less damage. Both systems carry wind ratings suited to nor'easters, and flashing at chimneys, skylights and sidewalls gets replaced with the roof, not reused.
A roofing permit is required for any full tear-off or structural repair in Somerville. The city’s Inspectional Services Department reviews the scope, and the permit must be posted on site before work begins. We apply for the building permit as part of the job, so you do not have to handle the paperwork or the schedule.
An inspector visits twice. The rough inspection takes place after we strip the old roof and replace any damaged decking. The inspector checks the nailing pattern and the ice and water barrier before the shingles go on. The final inspection takes place once the roof is complete, including flashing, ridge venting and the drip edge. Both checks confirm the work meets the Massachusetts building code and the manufacturer's installation specifications.
A written proposal should list the scope so you can compare roofing contractors on the same terms. Before you sign, check for these line items.
Towns next to Somerville where our crews have finished projects. Each town page shows that work and the services we offer there.
Check that the contractor holds a Massachusetts HIC license and carries liability and workers' compensation insurance. Ask whether the crew are employees or subcontractors. A written proposal should list the exact shingle brand and line, the underlayment type, the ice and water barrier coverage, and the ventilation method. References from nearby towns and photographed completed work give you a sense of the finished quality.
Most repairs on Somerville homes address a leaking pipe boot, damaged flashing around a chimney or a dormer, or missing shingles after a nor'easter. A repair stops the active leak. On an older roof with worn granule coating and curled shingles, a repair buys time but does not provide the long-term protection of a full replacement.
The process is the same as on a single-family home: tear-off of the old layers, deck inspection, ice and water barrier along the eaves and in valleys, synthetic underlayment, new drip edge and flashing, shingle installation, and ridge venting. The main difference is coordinating access and staging on a tighter lot with shared driveways or abutting buildings, which we plan during the site visit.
Yes. The City of Somerville requires a building permit for a roof replacement. The permit triggers a rough inspection after the old roof is off and the underlayment is on, and a final inspection once the shingles and venting are complete. We pull the building permit, schedule the inspections, and confirm the work passes before we consider the job done.
The shingle systems we install come from GAF and CertainTeed. Both manufacturers offer lines rated for wind uplift and impact resistance that hold up to the freeze-thaw cycles and nor'easters common in coastal New England. The system includes the shingles, a self-adhered ice and water barrier, a synthetic underlayment, and ridge venting to manage attic moisture.
Have a question that isn’t here? Ask us or call (800) 984-2667.
Ask AI about this service:
Towns we serve & Cases45 towns
Every town below has its own page: local projects, typical prices and the crew that works there.
Free online quote in minutes, or talk to a project manager today.