$16,100–$24,680
full roof replacement, typical 2,000 sq ft roof
Installed by our own crew, with free in-home measurement and a written price.
$16,100–$24,680
full roof replacement, typical 2,000 sq ft roof
$17,000
median written estimate, 2025–2026
$13,500middle half of jobs$22,000
Typical measured roof: 21 squares
From our measured estimates, 2025–2026 — signed and unsigned. Every job is priced line by line, so yours will differ. These are the typical quantities.
How we estimate a roofA roof replacement on a Brookline house means planning for the town’s mix of older wood framing, historic district rules in some neighborhoods, and New England weather that brings ice dams and nor’easters. We walk you through the job, from the first measurement to the final inspection, so you know what to expect before you hire a contractor.
The work starts with a full tear-off down to the roof deck. Removing the old shingles lets us inspect the plywood or plank sheathing and replace any sections softened by past ice dams or trapped moisture, which is common on older colonials and capes in town.
The sequence that follows protects the house through every New England season:
We install GAF and CertainTeed asphalt shingle systems, both built for the freeze-thaw cycles and wind of New England winters. On every roof we run ice and water barrier along the eaves and valleys, where meltwater backs up behind ice dams, and synthetic underlayment over the rest of the deck.
Ventilation matters just as much. A balanced ridge vent and intake vent setup keeps the roof deck cold, which limits the melting and refreezing that forms ice dams in the first place.
A roof replacement in Brookline requires a building permit before any shingles come off. We handle the application, pay the fee, and post the permit card. The Brookline Building Department checks that the roof assembly meets the Massachusetts state building code, including the ice and water barrier membrane along the eaves and in valleys.
Two inspections follow. The rough inspection happens after the old roof is stripped and the underlayment and ice barrier are in place, but before the shingles go on. The final inspection is scheduled once the roof is complete, with flashing, ridge venting and drip edge installed. We are on site for both and walk the finished roof with the inspector to close out the permit.
A roofing quote should list each part of the work separately, not as one lump sum. Compare line items between contractors to see what is actually included.
Towns next to Brookline where our crews have finished projects. Each town page shows that work and the services we offer there.
Yes. The Town of Brookline requires a building permit for a full roof replacement. We take out the building permit as part of the job and schedule the inspections. A town inspector checks the rough work after the old roof is off and the underlayment is on, then does a final inspection when the shingles and flashing are complete.
Architectural asphalt shingles are the most common choice on Brookline colonials and capes. A GAF Timberline or CertainTeed Landmark system with proper ice and water barrier and ridge venting handles the freeze-thaw cycles and nor’easters well. The shingle lifespan depends more on the quality of the install and the attic ventilation than on the shingle itself.
The dam forms at the eaves: attic heat melts snow near the ridge, and the meltwater refreezes where the roof overhangs. We address this with continuous ridge venting, balanced intake vents at the soffits, and a full width of ice and water barrier membrane along the eaves and in the valleys. On Brookline houses with finished attic spaces, we check the insulation depth and baffles before the roof goes on.
We replace all roof flashing as part of the job: step flashing at sidewalls, chimney flashing with a reglet cut into the mortar, and continuous flashing at skylight curbs. Reusing old flashing almost always leads to leaks within a few seasons, especially on Brookline houses where the chimney brick and mortar have been through decades of freeze-thaw cycles.
The time on site depends on the roof size, the number of layers to tear off, and the weather. A typical single-family house in Brookline takes a few days for the tear-off and install, plus a day or two for the inspections. We schedule around the forecast so the roof is dried in before any rain or snow arrives.
Have a question that isn’t here? Ask us or call (800) 984-2667.
Ask AI about this service:
Towns we serve & Cases45 towns
Every town below has its own page: local projects, typical prices and the crew that works there.
Free online quote in minutes, or talk to a project manager today.