Watertown, MA - siding completed May 2024. In-progress photos of an attached townhouse row show the facades stripped to housewrap and bare boards, with the first section already finished in dark gray lap siding and white trim.
One photo catches the row mid-tear-off: the old siding is gone, exposing bare board sheathing under freshly stapled housewrap, with cantilevered balconies and their railings still in place at each unit. A second frame comes in close on a lower wall, where housewrap runs down to the brick foundation and the gas meters, spigots and conduit have been pulled clear of the wall. The last photo shows the far end of the building finished in gray lap siding with white casings, three stories tall, with wood stairs and landings at each entry.
The crew stripped the old cladding to sheathing and re-wrapped the walls before hanging new siding. Balconies, entry landings, meters and service lines all had to be worked around rather than removed. Openings were re-cased and starter and corner trim run at each unit, and the work moved unit by unit along the row with ladders rather than full staging.
Details visible in the photos include row of attached townhomes, gabled entry porches, second-floor balconies. Materials on the elevation: vinyl lap siding, housewrap weather barrier, white trim, wood balconies.
Specified here: CertainTeed, ThermaTru. The finish shown is dark gray. The site was cleared at the end of each working day rather than only at the end of the job. The same crew that started the project finished it.
Serving Greater Boston homeowners - get a free assessment and a written quote for your own project.